These are just a few of our most recent projects, but we had installed more than 200+ projects around the globe. Take a look and contact us for many more projects.

Geneo MET Canopy

C O M M E R C I A L


3,000 m2 5-storey glulam canopy structure, with 1.4 m diameter columns and 1m deep arches.

The covering is a tessellated surface for double glazed units. 


Kong Meng San Phor Kark See Monastery

An intricate glulam roof beams covered by ETFE Design, supply and installation of mass engineered timber structure beams. so far in Asia. 

C O M M E R C I A L


Owner: Kong Meng San Phor Kark See Monastery

Main Contractor: CHL Construction

Architect: Archideas Design

Timber Engineer: Ronnie and Koh Consultants 


Jurong Lake Gardens

Bedok Reservoir Water Venture

Advance geometry and fabrication methods adopting GIROD ( Hybrid connection methodologies).Claimed to be the most complex timber project attempted so far in Asia. 

Ritz Carlton Maldives

A sustainable structure for the remote over-water destination resort. The Property has since received various accolades and featured in Times and Forbes among other publications.

Main Contractor: Sanken Overseas

Client: Pontiac Land Singapore

Architect: Kerry Hill Architects

Engineer: Ronnie & Koh Consultants

Structural System: Hybrid MET with steel


Changi Chapel Museum

Sumang Sports Hall

Main Contractor: Kwan Yong Construction P/L

Client: Ministry of Education Yusof Ishak Secondary School

Architect: Surbana Jurong Consultants P/L

Engineer: Beca Carter Hollings & Ferner (S.E. Asia) Pte Ltd

Structural System: Glulam

Sector: Recreational Sports Hall

Completed: 2019 

CFA : 2325 M2

Mass Timber: 516 M3

Woh Hup@Gul Circle

Main Contractor & Client: Woh Hup Pte Ltd 

Architect:  Lander Loke Architects 

Engineer:  Ronnie & Koh Consultants 

Structural System:  RC Volumetric Core, Glulam, CLT

Completed: 2018

CFA:  3500 M2

Mass timber: 700 M3

Steel: 75 tonnes

Time to install: 8 weeks

Kranji Camp Army Barracks Singapore

Main Contractor:  Quek Hock Seng Construction Pte Ltd

Client:  Defence Science and Technology Agency (DSTA)

Architect:  IDA Architects Singapore 

Timber Consultant:  Ronnie & Koh Consultants Pte Ltd

Scope:  Design, supply and install of double storey CLT and Glulam structure with external cladding

Complete: 2017

MET: 700 M3 plus 360 m2 of thermowood cladding

GFA: 2500 M2

Marina Bay Sands Skypark (decking works)